IGA / ISTANBUL NEW AIRPORT, MV CABLING INFRASTRUCTURE WORKS, 2020
In the project, which was started to be built on a turnkey basis under the commitment of Kalyon İnşaat San. ve Tic A.Ş., 65 km of Medium Voltage cabling works between the IGA GIS Center and THY/ THY Technical Energy Centers were completed and delivered in 2020.
THY A.O. Istanbul New Airport, A Zone Parking Lot and Infrastructure Electrical Works, 2020
In the turnkey project, which was completed in 2020 under the commitment of Kalyon İnşaat San. ve Tic. A.Ş., MV cabling between IGA-Substation and A zone energy center, intercellular F/O communication and certification works, lighting pole and cabling works in parking lot and road route, parking lot security, license plate recognition, barrier and CCTV system works were completed and successfully put into use.
MARMARAY Project CR3 Contract, Gebze - Halkalı Suburban Line Improvement: Construction and Electromechanical Systems Work, 2017
In the project, which was started to be built in 2017 under the commitment of KKC Marmaray Construction Ordinary Partnership Commercial Enterprise, our company successfully completed the electrical infrastructure and weak current works of 13 stations in total, including 8 on the Anatolian Side and 5 on the Istanbul Side, and the Maltepe OCC Building in March 2019, and the line was opened for service.
Gayrettepe - 3rd Airport Subway Line Electromechanical Systems Work, 2017
In the project, which was started to be built under the commitment of KKC Marmaray Construction Ordinary Partnership Commercial Enterprise; our company has gradually completed the electrical works of Ihsaniye Segment Factory and the electrical infrastructure mobilization works necessary for the construction of subway stations.
YEKA Solar Power Plant - 1, Konya
In the ongoing project with 1000 megawatt installed power under the commitment of Kalyon İnşaat San. ve Tic. A.Ş., our company has completed DC-MV and fiber optic infrastructure works (15 km of excavation, piping, 70 km of cabling) in the first section of 20 megawatts.
Kartal Lütfi Kirdar Training and Research Hospital, Electrical Infrastructure Mobilization Works
In the project, which was started under the commitment of Kalyon İnşaat San. ve Tic. A.Ş., field installation and electrical infrastructure mobilization works were completed.
Melen Water Project between Karasu and Şile
In the project, which was completed under the commitment of Kalyon İnşaat San. ve Tic. A.Ş. and ASL İnşaat Taah. ve San. Ltd. Şti, construction site installation and mobilization works were carried out within the scope of the water line project between Melen Karasu - Şile.
Istanbul International Finance Center ILBANK and BRSA Blocks
In the project, which will include offices, shopping centers, hotels, residences, congress centers, mosques, police stations, health centers, fire brigades, kindergartens, underground parking lots, and viaducts on a construction area of approximately 2.500.000 m2 at Istanbul Finance Center, which was designed to include Istanbul among the 25 global financial centers in the world and to ensure that Turkey is among the top 30 countries in terms of financial development, our company has gradually completed the field mobilization works of low voltage electricity and weak current infrastructure in İlbank and BRSA blocks and throughout the construction site.
Highways 1st Region & Kalyon Construction Joint Venture
Realization of FO infrastructure and all FO terminations in the Tunnel Control Center of between Mecidiyeköy Participation - Çağlayan Crossroads and Tunnel Construction Electromechanical Works (Tunnel Automation, CCTV and Fire Security Sensor Infrastructure), Establishment of F/O connection between Çağlayan TKM and Kağıthane TKM, realization of additional F/O routings.
Preparation of the F/O infrastructure project, F/O Cabling of 19.900 m. and 1352 joints.
Taksim Tunnel Pedestrianization Study
In-tunnel CCTV and automation system FO infrastructure, CCTV system installation and commissioning, fire, linear fire system, SOS system cabling and commissioning works...
CABLE TV PROJECT AND CONSULTANCY
- Istanbul European Side; Bahçelievler Fiber Node- Preparation of Fiber Optic infrastructure and installation of 24.148 m. FO cabling was carried out and 678 FO joint were made.
- Creation of the FN (Fiber Node) upgrade project in Izmir Hatay, Gaziemir, Alsancak regions and supervision of FO field applications. 76,500 m. FO cabling was carried out and 1210 FO joint were made.
- Creation of a total of 54 FN (Fiber Node) upgrade projects in Antalya Province and supervision of FO field applications.
- Creation of a total of 85 FN (Fiber Node) upgrade projects in Adana Province and supervision of FO field applications.
- Execution of project - sales consultancy and application subcontracting of special projects of Eker Ltd. Company, a cable TV operator, in Istanbul 3rd Region (Bahçelievler, Halkalı, Avcılar, Bahçeşehir, Beylikdüzü), Adana, Gaziantep and Kayseri provinces between 01.10.2009 and 01.10.2011.